Sign In | Join Free | My lightneasy.org
China Qingdao Xinguangzheng Global Engineering Co.,Ltd logo
Qingdao Xinguangzheng Global Engineering Co.,Ltd
make customers happier, let the enterprise more lasting
Verified Supplier

3 Years

Home > Steel Structure >

Customized Steel Structure Era Overpass Project

Qingdao Xinguangzheng Global Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Customized Steel Structure Era Overpass Project

Contact Now

Steel Structure Project

Project Name: Zhongjie Era Overpass
Project Address: Qingdao, China

Project Description

Project Name: Zhongjie Era Overpass

Project Address: Qingdao, China

Project Brief Description: Zhongjie Era Overpass Project is Pingdu's first cross-street bridge project, the whole project consists of three overpasses, the east side of the straight overpass bridge length 56.3 meters wide 5 meters, the west side of the straight overpass bridge length 49 meters wide 5 meters, the middle of the circular overpass main bridge diameter 56 meters, petal shape, the narrowest 6.5 meters wide 12 meters.

The overpass project consists of three overpasses, namely the east straight overpass located about 130 meters west of the intersection of Hongqi Road and Zhengzhou Road, the west straight overpass located about 45 meters east of the intersection of Hongqi Road and Lanzhou Road, and the central circular overpass at the intersection of Hongqi Road and planned Jingzhou Road. With a total investment of 64.57 million yuan, the project is a public service facility built for the benefit of the people. The straight bridge on the east side is 56.3 meters long and 5 meters wide, connecting the second block of Zone A and B of Zhongjie Times Overbridge. On the west side, the straight bridge is 49 meters long and 5 meters wide, connecting the second block of ZONE C and D of Zone C. The central circular bridge as the main body of the building, the diameter of the main bridge surface reached 56 meters, meaning the unity and progress of 56 ethnic groups, the bridge surface is a flower shape, take the meaning of "bloom", the narrowest 6.5 meters, the widest 12 meters, in practical and aesthetic to achieve the largest balance, The central bridge faces the three blocks A, B and C of Zhongjie Times Sky Street and the Red Star Macalline Home and Life Plaza, connecting the four directions through the corridor, opening up the second floor business of the four blocks. It is the most important central system of the bridge.


Product Tags:

Steel Structure Era Overpass Project

      

W 5Meters Steel Structure

      

Customized Steel StructureOverpass Project

      
Buy cheap Customized Steel Structure Era Overpass Project product

Customized Steel Structure Era Overpass Project Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Xinguangzheng Global Engineering Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)